
Applicable (Y)es / (N)o |
(C)onfidentiality |
(I)ntegrity |
(A)vailability |
RPN (C+I+A) |
(S)atisfactory |
||||||
L1 |
M2 |
H3 |
L1 |
M2 |
H3 |
L1 |
M2 |
H3 |
(O)ther than satisfactory +## |
||
|
|
|
|
|
|
|
|
|
|
|
|
###
sc-10 |
network disconnect |
|
|
assessment objective: Determine if: |
|
sc-10[1] |
the organization defines a time period of inactivity after which the information system terminates a network connection associated with a communications session; and |
|
sc-10[2] |
the information system terminates the network connection associated with a communication session at the end of the session or after the organization-defined time period of inactivity. |
|
potential assessment methods and objects: Examine: [select from: System and communications protection policy; procedures addressing network disconnect; information system design documentation; security plan; information system configuration settings and associated documentation; information system audit records; other relevant documents or records]. Interview: [select from: System/network administrators; organizational personnel with information security responsibilities; system developer]. Test: [select from: Automated mechanisms supporting and/or implementing network disconnect capability]. |
||