Applicable (Y)es / (N)o |
(C)onfidentiality |
(I)ntegrity |
(A)vailability |
RPN (C+I+A) |
(S)atisfactory |
||||||
L1 |
M2 |
H3 |
L1 |
M2 |
H3 |
L1 |
M2 |
H3 |
(O)ther than satisfactory +## |
||
|
|
|
|
|
|
|
|
|
|
|
|
###
cm-3(2) |
configuration change control | test / validate / document changes |
|
|
assessment objective: Determine if the organization, before implementing changes on the operational system: |
|
cm-3(2)[1] |
tests changes to the information system; |
|
cm-3(2)[2] |
validates changes to the information system; and |
|
cm-3(2)[3] |
documents changes to the information system. |
|
potential assessment methods and objects: Examine: [select from: Configuration management policy; configuration management plan; procedures addressing information system configuration change control; information system design documentation; information system architecture and configuration documentation; information system configuration settings and associated documentation; test records; validation records; change control records; information system audit records; other relevant documents or records]. Interview: [select from: Organizational personnel with configuration change control responsibilities; organizational personnel with information security responsibilities; system/network administrators]. Test: [select from: Organizational processes for configuration change control; automated mechanisms supporting and/or implementing testing, validating, and documenting information system changes]. |